安裝要點(diǎn):
傳感器的信號(hào)線要遠(yuǎn)離動(dòng)力線和接觸器等強(qiáng)干抗設(shè)備。電源供電范圍:交流或直流9~~24V,過(guò)高的電壓可能會(huì)損壞本設(shè)備。傳感器的安裝面必須緊固在上下擺動(dòng)的角位移面,并且要和擺動(dòng)方向相同(見(jiàn)傳感器上的標(biāo)識(shí))。
調(diào)試要點(diǎn)(必要的2步)
A、請(qǐng)檢查設(shè)備的運(yùn)行方向和測(cè)量顯示方向是否一致,如果不一致,請(qǐng)將傳感器的方向掉轉(zhuǎn)
B、將設(shè)備調(diào)整到0度的位置,然后在此位置設(shè)置,將當(dāng)前測(cè)量值清零
Install Essentials
Sensor signal cables away from power lines and interference equipment such as contactors. Scope of supply: AC or DC 9--24V, high voltage may damage the device Bobbingsensor mounting surface must be fastened at corners Moving surfaces, and swing in the same direction(see marks on the sensor).
Debugging points(need 2 step)
A, Check the running direction and measure the display orientation is consistent, if not, move the sensor direction turned
B, Adjust the device to O degree position, then this location is set, the current measured values to zero